專任老師

陳怡兆 助理教授

國立成功大學土木工程研究所 工程管理組 博士

數位創新與先進構造研究中心(Center for Digital Innovation and Advanced Constructure)

建築資訊與專案管理研究室(Lab. of BIM and Project Management)

yjchen@nuk.edu.tw

TEL 07-5916536
FAX 07-5919386

授課領域

建築資訊模型特論(Advanced Study on Building Information Modeling)

先進構造技術特論(Special Topics on Advanced Construction Technology)

建築工程專案管理(Construction Project Management)

虛擬實境智慧城市規劃應用(Application of VR in Intelligent Urban Planning)

建築構造(Materials and Methods of Building Construction)

建築結構力學(Architectural Structure Mechanics)

施工估價(Fundamentals of Construction Estimating)

研究領域

BIM建築資訊模型應用(Application of Building Information Modeling)

建築工程專案管理(Construction Project Management)

虛擬實境城市規劃應用(Application of VR in Urban Planning and Simulation)

電腦輔助建築設計(Computer Aided Architecture Design)

建築材料與構造(Materials and Methods of Building Construction)

空間資訊系統(Spatial Information System)

獲獎/榮譽

1. 指導學生參加2017年第7屆建築虛擬實境設計世界盃比賽(Virtual Design World Cup--The 7th Student BIM & VR Design Contest),獲獎名單如下:
 廖珮珊、陳芊云、黃瑞國,作品「Yangon Green Labs」 蟬聯世界盃冠軍Grand Prix - World Cup Prize。
 鄭宇翔、陳光柔、林詩雅、朱承鎧,作品「Golden Hub」獲得亞軍Excellent Prize。
 楊于萱、彭俊誠、王寶緯、葉洺郃、陳俊佑,作品「WATER LINK」獲得評審團特別獎Judge's Special Prize—New Value Award。
2. 指導碩士班學生賴永山同學榮獲2017年度東京都學術論文獎,論文題目:結合BIM與擴增實境技術於消防安全設備檢測之應用。
3. 2017年第21屆營建工程與管理學術研討會獲選最佳論文獎(論文題目:結合 BIM 與擴增實境技術於消防安全設備檢測之應用)。
4. 指導學生參加2016年第6屆學生建築虛擬實境設計世界盃比賽(Virtual Design World Cup--The 6th Student BIM & VR Design Contest),獲獎如下:
 張峻峯、王思堯、黃怡寧組成的隊伍,作品「Green Wave」獲得本屆世界盃冠軍World Cup Prize最大獎。
 葉家丞、徐文澤、鄭宇翔,作品「Melbourne Ripple」榮獲評審特別獎--Sustainable Development Award
 吳姝誼、廖珮珊、葉簇穎,作品「ReMelbourne Transfer Station」榮獲評審特別獎--New Value Award
 劉易、呂岳桐、詹皓惟,作品「Connecting People Connecting City」榮獲評審特別獎--Visionary Award
5. 指導學生參加2015年第5屆學生建築虛擬實境設計世界盃比賽(Virtual Design World Cup--The 5th Student BIM & VR Design Contest),作品「Flourishing Keelung」以基隆車站再發展為主題,榮獲優選獎。
6. 2014年第18屆營建工程與管理學術研討會獲選優等論文獎(論文題目:建構BIM為基礎之橋樑工程成本管理模式)。
7. 2007年第11屆營建工程與管理研討會獲得佳作論文獎(論文題目:應用專案多維度模型建構以合約項目為基礎之自動排程模式)。

Papers
  1. Yi-Jao Chen, Chung-Wei Feng, Kai-Ming Yang (2015, Sep). The Development of BIM Model-based Construction Project Performance Evaluation Mechanism. Civil Engineering and Architecture, 128-135, 3(5) . MOST 103-2221-E-426-001.
  2. Chen, Y. J.*, Feng, C. W., and Lee, K. W., (2012, Nov). The Application of BIM Model in M/E/P Construction Coordination. Applied Mechanics and Materials, Vols. 229-231, pp. 2760-2764. (EI). NSC 100-2221-E-426-004.
  3. Chen, Y. J.*, Feng, C. W., Wang, Y. R., and Wu, H. M. (2011, Jul). Using BIM Model and Genetic Algorithms to Optimize the Crew Assignment for Construction Project Planning. International Journal of Technology, (2011) 3: 179-187. (其它). NSC 99-2221-E-426-006.
  4. Wang, Y. R., Chen, Y. J., and Kung, H. L. (2011, Jan). Work Assignment Optimization Using Genetic Algorithms. Key Engineering Materials, Vol. 450, pp 526-529. (EI).
  5. Feng, C. W., Chen, Y. J., and Huang, J. R. (2010, May). Using the MD CAD Model to Develop the Time-Cost Integrated Schedule for Construction Projects. Automation in Construction, Vol. 19, No. 3, pp.347-356.. (SCI).
  6. Yeh, T. K., Chen, Y. J., Chung, Y. D., Feng, C. W., and Xu, G. C. (2010, Feb). Clarifying the Relationship between Quality of GPS Data and Precision of Positioning. Journal of Surveying Engineering, Vol. 136, No. 1, pp. 41-45.. (SCI). NSC 94-2218-E-231-001.
  7. Feng, C. W., and Chen, Y. J.*, 2008, “Applying MD CAD Model to Streamline Information Transformation for Construction Project Planning,” AEI 2008: Building Integration Solutions, ASCE, pp. 1-10. (ISBN: 978-0-7844-1002-8) (EI)
  8. 陳怡兆*、馮重偉、王政揚(2012年01月)。應用BIM模型的建築設計審查模 式之初步研究。營建管理季刊,90期,pp.17-27。(其它)。
  9. 馮重偉、陳怡兆、黃俊儒,2007,“應用專案多維度模型建構以合約項目為基礎之自動排程模式”,營建管理季刊,72,1-16。
Books

學位論文

1. 專案資訊整合模型之建構與專案管理資訊系統之應用(The Development of Project Information Model and the Applications of PIM Model-based System)。國立成功大學土木工程研究所博士論文 。(2009年06月)。

2.GPS天線相位中心率定及相位中心改正之研究論文名稱(A study on the calibration and correction of the GPS antenna phase center)。國立交通大學土木工程研究所碩士論文 。(1998年06月)。

技術報告

1.陳怡兆(2016年10月)。建構以擴增實境BIM為基礎之情境感知設施維護管 理系統。科技部:104-2221-E-390-031。

2.陳怡兆(2015年10月)。建構以BIM資訊模型為基礎之設施維護管理應用模 式之研究。科技部專題研究計畫成果報告。科技部:103-2221-E-426-001。

3.陳怡兆(2014年10月)。建構以 BIM 為基礎之公共工程施工績效查核與評估模式 (II) 。科技部:102-2221-E-426-002。

4.陳怡兆(2013年08月)。建構以 BIM 為基礎之公共工程施工績效查核與評估模式 (I) 。科技部:101-2221-E-426-001。

5.陳怡兆(2012年07月)。以 BIM 模型為基礎建構自動化建築設計審查系統之研究(II)。行政院國家科學委員會專題研究計畫成果報告。國科會:100-2221-E-426-004。

6.陳怡兆(2011年07月)。我國營建業BIM發展策略之研究-子計畫四:以BIM模型為基礎建構自動化建築設計審查模式之研究。行政院國家科學委員 會專題研究計畫成果報告。國科會:99-2221-E-426-006。

Conference Papers
  1. Chung-Wei Feng, Yi-Jao Chen and Hsin-Yi Yu (2017, Jul). Employing Ontology and BIM to Facilitate the Information for Subcontractor’s Payment Requests and Ledger Generation . The 34th International Symposium on Automation and Robotics in Construction (ISARC 2017), Taipei. ISBN 978-80-263-1371-7.
  2. Yi-Jao Chen, Chung-Wei Feng and Jia-Rong Li (2016, Jul). The Application of BIM Model in Utility Failure Handling . 2016 ICENS International Conference on Engineering and Natural Science. MOST 104-2221-E-390-031.
  3. Chen, Y.J., C.W., Feng and K.M. Yang (2015, May). The Development of BIM Model-based Construction Project Performance Evaluation Mechanism. 2015 The 4th International Congress on Natural Sciences and Engineering, 日本京都. MOST 103-2221-E-426-001.
  4. Yi-Jao Chen, Chung-Wei Feng (2014, Jul). BIM Model-based Time-Cost Integrated Project Planning. Asian Conference on Civil, Material and Environmental Sciences, Hokkaido, Japan. MOST 102-2221-E-426-002. Chung-Wei Feng, Gabriela Andrade Lam, Ya-Ting Ho, Yi-Jao Chen (2013, Jul). CRITICAL CHAIN METHODOLOGY IN CONSTRUCTION PROJECT MANAGEMENT: A PRACTICAL FRAMEWORK. Creative Construction Conference 2013, Budapest, Hungary. MOST 101-2221-E-426-001.
  5. Yi-Jao Chen, Chia-Wei Huang, Chung Wei Feng, Yu-Ren Wang (2013, Jul). THE APPLICATIONS OF BIM MODEL IN DESIGNS CHECKING. Creative Construction Conference 2013. NSC 101-2221-E-426-001.
  6. Chen, Y. J.*, Feng, C. W., and Lee, K. W. (2012, Jul). The Application of BIM Model in M/E/P Construction Coordination. Proceedings of the 4th International Conference on Mechanical and Electrical Technology (ICMET 2012), Kuala Lumpur, Malaysia. NSC 100-2221-E-426-004.
  7. Feng, C. W., Mustaklem, O, and Chen, Y. J. (2011, Jul). The BIM-Based Information Integration Sphere for Construction Projects. Proceedings of the 28th International Symposium on Automation and Robotics in Construction (ISARC 2011), Seoul, Korea. NSC 97-2221-E-006-219-MY3.
  8. Wang, Y. R., Chen, Y. J., Yu, C. Y., and Jang, S. S. (2011, Feb). Benchmarking the Preproject Planning Practice for the Building Construction Industry in Taiwan. Proceedings of the 4th International Conference on Construction Engineering and Project Management, Sydney, Australia.
  1. Chen, Y. J.*, Feng, C. W., Wang, Y. R., and Chang, P. S. (2010, Aug). Applying Smart Graphic Objects to Automatically Generate a Construction Project Schedule in CAD System. Proceedings of the 14th International Conference on Geometry and Graphics (ICGG 2010).
  2. Chen, Y. J.*, Feng, C. W., and Huang, C. C. (2009, Aug). Incorporating PIM Model and RSM Method to Generate a Construction Schedule for the Multiunit Projects. Proceedings of the APSEC-EACEF 2009. 本人為第一作者、通訊作者.
  3. Chen, Y. J.*, Feng, C. W. (2009, Jul). PIM Model-based Optimal Crew Assignment for Integrated Cost and Schedule Planning. 2009年(第13屆)營建工程與管理學術研討會.
  4. Wang, Y. R., Chen, Y. J., and Huang, C. F. (2009, Jun). Applying Neural Network Ensemble Concepts for Modeling Project Success. Proceedings of the 26th International Symposium on Automation and Robotics in Construction (ISARC 2009).
  5. Feng, C. W.*, and Chen, Y. J., 2008, “Using the MD CAD model to Develop the Time-Cost Integrated Schedule for Construction Projects,” Proceedings of the 25th International Symposium on Automation and Robotics in Construction (ISARC 2008), June 27-29, 2008, Vilnius, Lithuania, pp. 573-584. (ISBN: 978-9955-28-304-1) (ISI Proceedings, SCI)
  6. Chen, Y. J.*, and Feng, C. W., 2008, “Streamlining the Data Transformation Process for Construction Projects via Building Information Modeling,” Proceedings of the 25th International Symposium on Automation and Robotics in Construction (ISARC 2008), June 27-29, 2008, Vilnius, Lithuania, pp. 549-558. (ISBN: 978-9955-28-304-1) (ISI Proceedings, SCI)
  7. Feng, C. W., and Chen, Y. J.*, (2006), “Using MD CAD Objects to Automatically Generate A Contract-Driven Schedule,” Proceedings of the 23rd International Symposium on Automation and Robotics in Construction (ISARC 2006), October 3-5, 2006, Tokyo, Japan, pp. 740-745.
  8. Feng, C.W.*, and Chen, Y.J., (2005), “Using MD CAD Objects to Integrate Information for Construction Projects,” Proceedings of the 1st International Conference on Construction Engineering and Management (ICCEM 2005), October 16-19, 2005, Seoul, Korea, pp. 515~519.
  9. 賴永山,陳怡兆(2017年06月)。結合BIM與擴增實境技術於消防安全設備 檢測之應用。第21屆營建工程與管理學術研討會,雲林。本人為通訊作者。榮 獲最佳論文獎。
  10. 林子涵, 陳怡兆, 馮重偉(2016年06月)。應用 Ontology 與 BIM 於裝修工 程排程管理。2016 營建工程與管理學術研討會,台南。科技部:104-2221-E- 390-031。
  11. 李佳融, 陳怡兆, 馮重偉(2015年07月)。以COBIE為基礎建構設施維護之 BIM資訊交付規範架構-以設施故障維護為例。2015年第19屆營建工程與管 理學術研討會。
  12. 李則威;馮重偉;陳怡兆(2014年06月)。建構BIM為基礎之橋樑工程成本 管理模式。第18屆營建工程與管理學術研討會,宜蘭。獲選優等論文獎。
  13. 王政揚、陳怡兆、馮重偉(2011年06月)。應用建築資訊模型(BIM)於建築執 照審查之探討。2011年(第15屆)營建工程與管理學術研討會,台北。國科 會:99-2221-E-426-006。
  14. 馮重偉、陳怡兆(2009年08月)。以專案資訊模型為基礎建構符合施工需求 之資訊轉換與整合模式。2009營建管理研討會。
Educations

國立成功大學土木工程研究所工程管理組    博士

國立交通大學土木工程研究所空間資訊組    碩士

國立交通大學土木工程學系    學士

Experiences

國立高雄大學建築學系 專任助理教授

國立高雄大學教學品保組組長

國立高雄大學創意設計與建築學系 專任助理教授

康寧大學資訊傳播學系 專任助理教授

立德大學資產管理與城市規劃學系 專任助理教授

立德大學營建規劃學系 專任講師

國立高雄大學創意設計與建築學系 兼任助理教授

國立高雄應用科技大學土木工程系 兼任助理教授

國立成功大學都市計劃學系 兼任助理教授